Jászberény City Center (2008)

Jászberény City Center
Jászberény

Point foundations with precast precast reinforced concrete piers, 30 m long double-supported reinforced concrete prestressed beams . The slab is insulated with rock-fibre insulation laid on high-wall tarpaulin sheets, with PVC sheeting for insulation against rainwater. The surrounding wall structure is a PU foam filled metal sandwich panel. The openings are made of aluminium profile safety glazing. Internal walls are made of plasterboard.

Client:

Jász - Border Ltd.

Planner:

Architex Architects Ltd.-Dankó Zoltán

Project Officer:

Csaba Tóth

Construction manager:

Zoltán Sohodóczki

Lead time:

June 2008 - mid-November 2008

Tags:

City Center, construction, Jászberény