Rákosmezeje ZRT. new hall (2006)

Rákosmezeje ZRT. new pay hall

Prefabricated reinforced concrete pillar and girder building with silver coloured metal-armoured insulated sandwich panel surround structure, soft-roofed flat roof.

Investor:

Rákosmezeje Rt.

Planner:

Hélis Ltd.

Operator:

Lajos Borbély

Project Officer:

Béla Mester

Construction manager:

Lajos Papp

Lead time:

April 2006 - July 2006

Tags:

hall, construction, Rákosmezeje ZRT.