Hama Hall and Office extension (2008)

Hama Hall and Office Extension
Budapest XVIII. district Zádor utca 18.

Extension of existing office building and existing hall building. A new floor will be built on top of the office building using traditional construction technology. The existing steel-framed hall building will be extended with a prefabricated reinforced concrete structure hall.

Client:

Hama Ltd.

Planner:

4. Group Architects Ltd.

Project Officer:

Lajos Papp, krisztián minorics

Construction manager:

Imre Pénzes

Lead time:

July 2008 - December 2008

Tags:

expansion, Budapest, hall, hall building, Hama, office